SHANECO
design
institute
RU
EN
Institute
Services
Projects
Media Center
Contacts
Sebryakovcement
Service:
Basic design, design solutions, construction method statement, and disassembly method statement for reconstruction and conversion of Rotary Kiln 7 to the dry process with the daily productivity of 3575 tonnes
Hydrometeorological engineering surveys
Home
Projects
Region:
Volgograd region
Industry:
Production of construction materials
Customer reviews
All reviews
Sebryakovcement
See also
All projects
The combined cycle gas turbine unit of a 900 MW electrical capacity and 840 Gcal*h thermal capacity CHP plant
Abakansky mine